POEM has been advised by the NSW Government that construction of the attenuator (panel breakwater) in Snug Cove is now a high priority. This will provide a safe harbour for small vessels and protect the harbour infrastructure.
The final attenuator design and siting issues should be resolved soon so that construction can be carried out in tandem with the Breakwater Wharf extension under the one contract.